DocuShare is now read-only. Use Google Drive.
The server is currently operating in read-only mode to allow routine maintenance operations to be performed.
Properties cannot be edited at this time.
| IceCube Upgrade Population.pdf | |
| Handle: | v_Document-89758 |
| Owner: | Tosi, Delia (User-511, detosi:LDAP)DS |
| Tuesday, October 19, 2021 07:44:42 PM CDT | |
| Tuesday, October 19, 2021 07:44:42 PM CDT | |
| Modified By: | |
| - IceCube Upgrade Logistics: Population 1 • Season 1: • Outfitting of subsystems • Subsystem-level integration and testing • Seasonal Equipment Site (SES) setup • Season 2: • Full drill system integration and testing • Full power wet test • Firn drilling • Surface cable and Surface Junction Boxes Installation • Season 3: • Deep Drilling • Installation • Mothball and Retrograde Field Seasons 10/14/2021 IceCube Upgrade Logistics: Population ... | |
| 1 | |
| Appears In: | IceCube Upgrade Population.pdf |
DocuShare is now read-only. Use Google Drive.